O’Dell Engineering Secures Encroachment Permits for Sewer Pipeline in 70 Days
April 18, 2014
O’Dell Engineering recently completed the design of a 42 inch sanitary sewer main from Mitchell Road to Moffett Road in the City of Ceres. The project required a 350 foot long horizontal shaft to be drilled under Highway 99 and the Union Pacific Railroad. O’Dell Engineering worked with Caltrans and UPRR to obtain approval for the drilling in under 70 days. As part of its work to secure the permits O’Dell Engineering submitted improvement plans and permit applications.
Go Back