Ceres Service Road Sewer Line Extension

O’Dell Engineering, a Westwood company provided design and coordination services for two sewer line projects in the City of Ceres. The Moffett Road to Mitchell Road segment included approximately 2,600 lineal feet of new 42” sewer line. The Crows Landing to Head Work segment included approximately 7,500 lineal feet of new 36” sewer line.  The […]

River Islands Recycled Water Line

The Recycled Water Line Project at River Islands consists of 8,370 linear feet of 16 inch pipe that will convey recycled water to various spray fields and other uses within the River Islands development. 2,400 linear feet of this pipeline is along the shoulder of Manthey Road, and the remaining pipe alignment follows a proposed […]

Shackelford Sewer Crossing of the Tuolumne River

This public works project installed a new twin-bore sanitary sewer crossing of the Tuolumne River in the City of Modesto. This project was permitted with all major resource agencies at the State and Federal level. This effort replaced a current aging sewer system, and included Horizontal Directional Drilling construction techniques.

R Street Bridge

The project included a box culvert to pass Fahren’s Creek and a separate pedestrian/bike path under the roadway. Surveying including land net and boundary surveying, right of way needs mapping, topographic mapping and construction staking. Additional work involved environmental permitting; designing multiple horizontal and vertical curves over the creek, a tie-in with the bike path […]

Sylvan Avenue Pedestrian Overcrossing

This project included nearly 35,000 sqft of landscaped area located around the construction zone of a new pedestrian bridge serving Enoch High School students. Communication with the City and School District was a key factor as complex issues arose with property boundaries, existing irrigation systems, and existing site materials. Responsibilities and services included project management […]

Buena Vista Bridge

This project included the construction of a new urban street bridge across the Fahrens Creek Bypass Flood Channel in the City of Merced. Interesting aspects of the project included FEMA compliance, a new bikeway undercrossing, flood channel constraints, utility resolutions, concrete pilings, concrete deck roadway, and pedestrian corridors.

White Rock Park

This project is a retrofit of an approximately 12 acre existing park adjacent to Highway 50 in Rancho Cordova. The park design included a new 3,000 s.f. community center, an approximately 4,000 sqft interactive water spray park and spray structure, a new playground, a children’s discovery zone, two pre-fabricated shade structures (30’x30’ and 15’x20’), an […]

River Islands Trail & Bikeway

O’Dell Engineering, a Westwood company’s landscape architecture department is currently designing a one mile recreation trail along the River Islands Development levee.

Earlimart Park

O’Dell Engineering, a Westwood company’s Landscape Architecture Department is currently designing the first and only neighborhood park in Earlimart, CA. The park is approximately four acres and is a joint use facility between the county and the neighboring elementary school. The park is funded by a Proposition 84 grant and contains a grass open space, […]

Ryno Park

This neighborhood park renovation of an old storm water retention basin included the addition of a large playground area with multiple play structures, picnic facilities, a basketball court, trap fencing, additional grass open space, and site lighting. The playground and additional amenities were thoughtfully prepared with socially inclusive principals as a core design strategy. Sensory […]